Odenton, Maryland
Phone/Fax: 410-672-0704
Email: eric@esdrafting.com

Home Profile & Services Gallery One Gallery Two Gallery Three Gallery Four


Collazo Residence (Renovation and Addition):

This house is located in the Herald Harbor area, Maryland. The project was for a second floor addition to include a new Master Bedroom Suite with private balcony, Guest Bedroom with private bathroom, multiple new fireplaces, Sitting Room and a Balcony overlooking the water. There is also a spiral stair up to a third floor study (Crow's Nest). A new First Floor entrance with foyer and steps was also included into the design. The intent was to make the addition look like it was originally built as one design plan. Designed in association with Smiley's Residential Design Service, LLC

Front View (Before)

 

 

 

 

 

 

 

 

 

 

Front View (After) The lines of the addition maintain symmetry.

 

                                Right Side Water View (Before)                                                                                    Right Side Water View (After)

 

 

 

 

 

 

 

 

 

 

 

 

Right Front View (After)

Changes enhanced the design rather than make it look like an addition.

 

View of "Old Place Creek Bay" off the Deck

 

 

 

 

 

 

 

 

 

 

 

 



Zublionis (Renovation and Addition):

This house is located in Davidsonville, Maryland. The project was for two additions on opposite ends of the existing dwelling. On one side a new 30'x30' In-Law Suite was added that included a private entrance, one bedroom, handicap accessible bathroom, living room, dining area and kitchenette. On the other side of the house a new 17'x21' Master Bedroom Suite was added that also included a complete renovation of the existing bathrooms to create a cleaner larger bathroom suite and walk-in closet. A new covered Front Porch, new siding throughout and changes to the Garage area were also completed.

 

Side View of the Garage. Area where the new In-Law Apartment is to be placed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

          This view is looking over in-ground pool with the rear of the garage to the far left.

          The screened-in porch is to be demolished.

 

 

 

 

 

 

Front View (Right Side) Construction has yet to begin. Lots of landscaping to be done.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Front View (Left Side) Construction has begun on the Master Bedroom Addition and Foliage removed for the Front Porch Addition. Good view of the Crawl Space, Beam and Floor Trusses to be used.

 

 

 

 

 

 

Front View after construction has been completed. You can see the Master Bedroom Addition in the distance, the new Front Porch, changes to the Garage and new Siding and Trim throughout.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                            Another View over the Pool after construction finished showing new patio where screened-in porch was and the new In-Law Suite.

 

 

 

 

 

Front Right View showing Garage and In-Law Suite. You can see the new roof line over the private entrance between the garage and the Addition.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                                                                         

 

Interior View of the Master Bedroom showing the spacious design and fine craftsmanship.

 

 

 

 



Holland (Renovation and Addition):

This house is located in Millersville, Maryland. The project was for the addition of a two story family room addition with finished basement, master bathroom remodel and addition and extending the garage out to provide for a secondary side entrance. Special consideration during the design process had to be given to the family room design because of the close proximity of the existing septic system. This project also required a variance hearing due to the fact the garage extension needed to reduce the front building restriction line.

 

View of Right Side showing Garage before Construction begins.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Garage view AFTER construction completed. Garage was extended towards front seven feet. You can also see the new stone archway side entrance and the master bathroom addition for the spa tub that was completed.

 

 

 

 

 

 

 

Rear of house before construction begins.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Two views of the rear after construction completed. The "L" shape of the design was due to the existing septic system location close inside the "L". Design included vaulted ceilings and a new fireplace in Family room.

 

 

 

 

 

 

 

 

 

 

 

 

 

Front view of the house during construction.

You can see the extension of the garage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The new 6' Spa Tub.

 

 

 

 

 

 

 

 

 

 

 

 

 

Interior view of the Family room showing the fireplace and vaulted ceilings. 

The wires from the television over the fireplace have since been hidden inside the wall.

 

 


Home | Profile & Services | Gallery One | Gallery Two | Gallery Three | Gallery Four
 
Last modified: 16 December, 2009
Copyright © 2002-2008 ES Drafting & Design, LLC. All rights reserved. 

Gallery Two